Power & Steam Generation System

YEAR PROJECT CLIENT TYPE Q'TY D.PRESS OUTPUT REMARK
2019 Young-kwang ORC 250KW Young-kwang ORC Package 1 set Refrigerant : R245-fa W2800x3350Hx12000L A516-70
2018 G-Project STX Heavy Industries Co., Ltd. Exh. Gas Boiler System 1 set 15 Bar.g 1.0T/hr x 2Set  
2018 KAI SAB 16MW PJT STX Heavy Industries Co., Ltd. Piping & Structure 55 - -  
2017 MOE IRAQ STX Heavy Industries Co., Ltd. Thermal oil heater 6 9 Bar.g 1200KW  
2016 DCM Recovery Tower IZUMI Environmental
Engineering Co., Ltd.
1'st Re-boiler 1 4Bar.g 800KW E-7703
2016 Feed Water Heater Spirax Sarco Condensate Heater 1 11/5Bar.g 20,816KW  
2016 PNG Doosan Engine Exhaust Gas Boiler
Oil Fired Boiler
02월 02일 7Bar 3.0T/hr
3.0T/hr
*
2016 SURENCO 10.9MW DPP Hyundai Heavy Industries Co., Ltd. E.G.B Container Unit 2 7Bar 1.3T/hr *
2016 BCS MEXICO Doosan Engine Exhaust Gas Boiler 1  9.3Bar 17.5T/hr *
2016 SUPREME 11.9MW PPS Hyundai Heavy Industries Co., Ltd. Exhaust Gas Boiler 2 7 Bar 1.5T/hr  *
2015 JINRO POWER PANAMA Hyundai Heavy Industries Co., Ltd. Exhaust Gas Boiler Oil Fired Boiler 01월 01일 7Bar 1.5T/hr
1.5T/hr
*
2015 UNIBOL 6.5MW DPP Hyundai Heavy Industries Co., Ltd. Exhaust Gas Boiler 1 7Bar 1.2T/hr *
2015 POWER PLANT Hyundai Heavy Industries Co., Ltd. Hot Water Boiler 1 7Bar 1,000KW *
2015 La Ceiba 30MW PJT Honduras Hyundai Heavy Industries Co., Ltd. Exhaust
GasBoiler Oil
Fired Boiler
01월 01일 7Bar 3T/hr
2T/hr
*
2015 Yemen Recycle Power Plant Hyundai Heavy Industries Co., Ltd. Waste Heat Recovery System 6 11.3 Bar 3,503 kg/h *
2015 PARIT BARU 20MW PT. ARENA MAJU BERSAMA Thermal Oil Heating System 2 3.0 Bar 2,000 KW *
2015 Hanwha-Iraq BNcP STX Heavy Industries Co., Ltd. Thermal Oil Heating System 2 5.0 Bar 1,200 KW *
2014 Lebanon Power Plant Hyundai Heavy Industries Co., Ltd. Waste Heat Recovery System 2 7.0 Bar 1,200 kg/h *
2014 NRC 85MW DPP STX Heavy Industries Co., Ltd. Waste Heat Recovery system 12 7.0 Bar.g 700 kg/h *
2014 MOE 360MW DPP STX Heavy Industries Co., Ltd. Thermal Oil Heating System 128 5.0 Bar 1,200 / 1,800 KW *
2014 E-Power 30MW DPP Hyundai Heavy Industries Co., Ltd. Waste Heat Recovery System 2 7.0 kg/㎠g 1.7 t/h *
2014 SINHA 50MW PROJECT STX Heavy Industries Co., Ltd. Waste Heat Recovery System 2 7.0 kg/㎠g 3.0 / 2.0 t/h *
2013 SCR Modification Work for power boiler SK Energy Economizer 4 102 Bar 143.52 t/h *
2013 BCC Project S-oil Exhaust Gas Boiler 1 5.3 Bar 5.2 t/h *
2013 Green Diesel Project GS E&C Exhaust Gas Boiler 1 4.5 Bar 4.0 t/h *
2013 Buk-jeju No.2 Doosan Engine Co., Ltd. Waste Heat Recovery System 1 7 Bar 5.5 t/h *
2013 PPT Tsukishima Kankyo
Engineering Ltd.
Waste Heat Recovery Boiler 2 7 Bar 24.5 t/h *

(*: Only Engineering)