Heat Exchanger, Packed Tower, Structure, Piping
- Project : GK-7,8
- End User : Toray Battery Separator Film Korea
- Client : IZUMI Environmental Engineering Co., Ltd.
- Material : A312-TP304 / A240-304 / STS304
-
Size
: t9.3 x I.D245.5 x L3,000 x 1set
: t9.3 x I.D604.9 x L3,000 x 3set
: t13 x I.D1,400 x L6,000 x 1set
: t6 x I.D1,400 x L4,500 x 2set
: t6 x I.D1,350 x L5,800 x 1set
: t4 x I.D600 x L2,000
- Design Pressure : 5 Bar.g
Air Receiver & Dryer Unit (Pressure Vessel)
- Project : CERROMATOSO 18.6MW GAS POWER PLANT
- End User : Colombia
- Client : Hyundai Heavy Industries Co., Ltd.
- Material : A516-70
- Size : t29 x I.D1,640 x L4,000 x 2set
- Design Pressure : 36 Bar.g
- Project : HADA 9.3MW GAS POWER PLANT
- End User : Colombia
- Client : Hyundai Heavy Industries Co., Ltd.
- Material : A516-70
- Size : t30 x I.D1,720 x L4,000 x 1set
- Design Pressure : 36 Bar.g